亚洲一级电影在线观看,九九精品无码专区免费,亚洲AV无码资源在线观看 ,欧美国产高清

IQC工程師英文簡歷

時間:2024-10-19 17:20:21 英文簡歷模板 我要投稿
  • 相關推薦

IQC工程師英文簡歷模板

  Name: Ms. YJBYS Gender: Female

IQC工程師英文簡歷模板

  Wedlock: Single Nation: Han

  Residence: Hunan-Changde Age: 27

  Location: Guangdong-Guangzhou Height: 157cm

  Target Locations: Guangdong-Guangzhou

  Target Positions: Quality/Safety Management-QA/QC Manager/Supervisor

  Quality/Safety Management-Supplier Quality Engineer

  Industry/Factories-Project Engineer

  Target Jobs: QA superior、 SQE/CQE、 project engineer

  Desired Salary: 7500 RMB/month Negotiable

  When Can Start: after 2013-08-16 later

  Education

  2008-09 ~ 2011-06 zhongshan university administration Bachelor Degree

  Training

  2013-04 ~ 2013-06 new oriental school cambridge speaking

  2012-06 ~ 2013-04 sony electronics huanan co.,Ltd Japanese(level 3) Japanese(level 3)

  2006-12 ~ 2007-03 foshan library public english test system PETS-3

  2006-07 ~ 2006-11 foshan library Japanese(primary)

  you are not full member,please contact us. (2010-08 ~ Present)

  Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics

  Job Title: supplier quality engineer Positions: Supplier Quality Assurance

  Job Description: Company engages in the production of DVD laser writer, is a precise manufacturing, each product is assembled by 30 ~ 40 components(include hardware parts/electronic parts/optical parts). the major work during this period is supplier quality assurance, include that support supplier improving their quality and check quality system for keeping the stability.

  1.evaluate the parts when new model is imported , discuss the demensions which are out of the spec. with the designer of headquarters in Japan, desinger will determine the ultimate judgement.

  2.when new model begin to get in mass production, establish the document for parts on line and shipment.

  3.According to the instruction of parts'approved specification and CTQ list ,establish the standard of inspection , educate the inspectors take the correct operation.

  4.review the limited the samples which are submitted by suppliers, discuss with relevant departments, if that's necessary, must be taken test-run to verify. after getting the conclusion by discussion,submit it to designer to make the final decision.

  5.handle the qualiy issues for parts' defect,if it gets great affect in production,must call an urgent meeting to discuss the further action.

  6.evaluated suppliers's quality/server/cooperation etc ,got the list of up-steam suppliers,summarized their quality issues and established the plan for improvement.

  7.implement AQAS audit based on the annual plan to verify supplier's quality system. (the auditor must get the qualification which is approved by Sony headquarters)

  8.company begins to implement self-inspection plan to supplier, give some inforation to the suppliers and introduce its guidance(the detailed instructions must be explained again by quality manager), and according to the plan implement audits on-site, connect sony headquarters to issue certification for qualified suppliers.

  9.establish QC flow for parts and make the managing plan for major suppliers base on headquarters's request.

  10.some of projects which were encouraged by company had been involved.(such as:cost down PJ/success PJ,etc.)

  Reason for Leaving: contract expiry

  you are not full member,please contact us. (2007-12 ~ 2010-06)

  Company Type: Foreign Enterprise Company Category: Electrical,Micro-electronics

  Job Title: SQE Positions: Supplier Quality Engineer

  Job Description: the company goes in for the production of thermal module , the component have many categories,for example,press/die-casting/extrusion/plastic,the major avail of the modules are used in VGA/DT/NB area,because of different parts with different process,so that ,incoming quality control include many contents, as below:

  1.comfirm parts in trail run phase and feedback the information .

  2.attend to the approval of new parts and PPAP's check.

  3.collect incoming issues and confirm the corrective action in periodic time,which lead vendor to improve quality.

  4.establish standard of inspection for product.

  5.audit vendor's quality ,service ,cooperation and timely for 8D report reply,take advice require improvement.

  6.deal with the defects parts after production,take negotiation with vendors,find out the responsibility and charge the cost,has saved nearly 3 million(RMB) for company in past two years.

  Reason for Leaving: orders decreased result in the job without energy

  you are not full member,please contact us. (2005-10 ~ 2007-11)

  Company Type: Foreign Enterprise Company Category: Other Production,Manufacturing,Processing

  Job Title: CQE/vice-director/SQE Positions: QA/QC Engineer

  Job Description: the company engaged in the production of lens,in this period,job include(一)control the quality of lens material,this include spherical lens and non-spherical lens,the first one have simple process and purchase from domestic, and the second one's main source is from abroad.(二)lens process management,control some of characterist.(三)deal with customer's complain.

  1.Take professional training for freshman.

  2.evaluate the items for new parts run into control run phase and establish standard of operation.

  3.Take quality tools work for data analysis,find out the method for solution.

  4.Lead quality improve team.

  5.evaluate and comfirm the quality issues,and take trace.

  6.Accompany the auditor for check the company's procedure and work.

  7.Control the quality of incoming product and manage vendors .

  8.According different product establish inspection plan.

  9.Establish the standard of operation and maintenance for equipments.

  Reason for Leaving: company immigrate to WuHan

  Project Experience

  individual project leader (2011-03 ~ 2011-09)

  Job Title: cost down PJ

  Project Description: through decreasig supplier's stock ,shortened their inspection time and loosening the

  quality standard under the condition of getting qualified verification to reach the purpose of cost down.

  Responsibility: 1.organize team member,collect original data,analyse it.

  2.according analysis result to identify the key factor in cost structure,evaluate the range of cost down and its possibility.

  3.associate with team members to recheck the evaluation result,establish concrete plan for execution.

  4.according verification result,discuss the rate how much can be taken cost down.

  5.submit headquarters the evaluation report,the rate of cost down will be negotiated by headquarters procurement department.(20 million USD had been taken cost down in this PJ)

【IQC工程師英文簡歷】相關文章:

IQC工程師英文簡歷表格08-21

iqc工程師轉正述職報告12-17

iqc工程師崗位職責01-14

IQC工程師個人簡歷模板06-11

IQC工程師的個人簡歷模板09-16

IQC工程師個人簡歷模板12-09

IQC工程師個人簡歷模板04-18

iqc工程師崗位職責7篇03-05

工程師--英文簡歷06-05

主站蜘蛛池模板: 2018亚洲а∨天堂| 亚洲加勒比少妇无码av| 亚洲乱码中文字幕在线| 欧美日韩人妻精品一区二区三区| 亚洲成色综合网站在线| 国产亚洲视频中文字幕97精品| 麻豆国产成人av在线播放欲色| 成人福利在线看| 无码人妻一区二区三区免费视频| 无码专区一va亚洲v专区在线 | 国产亚洲精品第一综合不卡| 成人国产精品一区二区视频| 三区在线视频| a国产一区二区免费入口| 99久久国产热无码精品免费| 国产毛片一区| 日韩中文精品亚洲第三区| 在线观看成人无码中文av天堂| 日韩在线精品成人av| 亚洲制服丝袜av一区二区三区| 毛片在线看免费| 中文字幕第一区| 亚洲欧洲日产国码无码av一| 国产成人av综合久久| 亚洲AV永久精品三区在线| 强奷乱码中文字幕| 大帝av在线一区二区三区| 国产噜噜噜| 国产精品导航一区二区| 久久久久久久久免费看无码| 欧美在线观看网址| 色婷婷av久久久久久久| 石家庄市| 亚洲精品一区二区三区在线观看 | 国产亚洲3p无码一区二区| 女人被狂c到高潮视频网站| 久久精品国产99久久丝袜| 亚洲国产精品浪潮AV| 韩国三级大全久久网站| 人妻无码| 无码人妻丝袜在线视频|