亚洲一级电影在线观看,九九精品无码专区免费,亚洲AV无码资源在线观看 ,欧美国产高清

大學英語閱讀理解題及答案

時間:2024-09-22 17:30:59 英語閱讀 我要投稿
  • 相關推薦

大學英語閱讀理解題及答案

  以下是由yjbys小編為大家提供的大學英語的閱讀理解題以及參考答案,歡迎要考六級的同學閱讀學習一下哦!

大學英語閱讀理解題及答案

  第一篇:

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.


【大學英語閱讀理解題及答案】相關文章:

高考英語閱讀理解題及答案03-07

英語閱讀理解題及答案初中03-06

小學英語閱讀理解題及答案03-06

英語閱讀理解題加答案03-08

英語閱讀理解題及答案高中03-06

大學四級英語閱讀理解題及答案03-06

初三英語閱讀答案理解題及答案01-17

大學英語閱讀理解題03-07

高二英語閱讀理解題及答案03-09

主站蜘蛛池模板: 午夜福利精品导航凹凸| 亚洲国产一区二区三区亚瑟| 无套内谢老熟女| 99视频精品国产免费观看| 泾阳县| 久久久久国产精品人妻aⅴ天堂| 色九月亚洲综合网| 亚洲欧美日韩在线不卡| 国产欧美在线一区二区三| 国产成人无码a区在线视频无码dvd| 亚洲婷婷六月的婷婷| 无码人中文字幕| 日日爽日日操| 2021自拍偷在线精品自拍偷| 汾阳市| 手机在线国产精品| 亚洲精品天天影视综合网| 116少妇做爰毛片| 亚洲精品乱码久久久久久v| 铅山县| 亚洲色帝国综合婷婷久久| 亚洲中文字幕久久精品无码喷水| 精品亚洲国产成人a片app| 久久天天躁狠狠躁夜夜躁| 精品国产综合成人亚洲区| 一本色综合网久久 | 欧美三级中文字幕在线观看| 欧美区一区二区三| 99热成人精品国产免费| 日韩精品无码区免费专区| 国产精品久久久久网站| 99精品久久久久中文字幕| 成人区人妻精品一熟女| 亚洲天堂免费| 日本道专区无码中文字幕| 国产亚洲精品久久www| 女人被男人爽到呻吟的视频| 成人无码专区免费播放三区| 国产精品日韩欧美一区二区三区| 国产偷人激情视频在线观看| 精品露脸国产偷人在视频|